Final Section of Feature Stair Installed 15 November 2017

Feature Stair - Project Peach, Birmingham

Fabulous shot of the top two sections of a 10 floor feature stair being lifted into position at one of our current contracts in Birmingham.

This staircase has been installed using electric hoists only and is due for completion at End April 2018 - watch this space for the final photos once it has been completed.

 

Back to top